"Inspecting progress on PC pool", 1970-10-06
File — Box: 3
Identifier: SC003_003_00296
Scope and Contents
"Inspecting construction progress on Palomar College's new $245,000 swimming pool recently was Frederick R. Huber, college president, (right) as he chatted with carpenter Jim Cowart of Chamac Inc., contractor. (The other worker was unidentified.) When completed in December, the pool will be 100 by 75 feet and 13 feet deep at its deepest end. Financing was by state and private funding." [Envelope contains additional images of the pool inspection; Palomar Dome is in the background of many...
Dates:
Other: 1970-10-06
"Inspecting progress on PC pool", 1970-10-06
File — Box: 3
Identifier: SC003_003_00297
Scope and Contents
[Envelope contains additional images from 10/06/1970 story regarding swimming pool inspection at Palomar College. See envelopes 295 and 296]