Skip to main content

Box 11

 Container

Contains 15 Results:

Bill H.R. 2076, 1995

 File — Box: 11
Identifier: SC016 11/11
Scope and Contents

This folder contains Bill H.R. 2076. This bill served as a description of the apporpriations for the Departments of Commerce, Justice, State, Judiciary, and Related Agencies for the fiscal year of 1996. Used in the 104th Congress, session 1.

Dates: Other: 1995

National Security, 1996

 File — Box: 11
Identifier: SC016 11/12
Scope and Contents

This folder contains a detailed plan and bill for the fiscal year of 1997. This includes letters written by Congressman Packard highlighting his clear push to have funds allocated to use to improve Camp Pendelton. Also included are letters in response to Packard's plan.

Dates: Other: 1996

Congratulatory Letters, 1996

 File — Box: 11
Identifier: SC016 11/13
Scope and Contents

This folder contains congratulatory letters written to Congressman Packard following his re-election into the House of Rep. in 1996. These letters come from a variety of members of the U.S government, both local and federal.

Dates: Other: 1996

Immigration Checkpoints San Clemente, 1997

 File — Box: 11
Identifier: SC016 11/14
Scope and Contents

This folder contains a detailed breakdown of the proposed changes to the San Clemente Immigration Checkpoints. This detailed breakdown comes from actual implementations of different stategies and lanes in order to speed up the flow of traffic through the checpoints. Along with this detailed breakdown, is a description of the then current project details (1997) and other potential future hopes or changes being sought.

Dates: Other: 1997

Draft Environment Assessment, Construction of (PAL), San Clemente Checkpoint, 1997 August

 File — Box: 11
Identifier: SC016 11/15
Scope and Contents This folder contains a Draft Environment Assessment for the "Construction of Pre-Inspected Automate Lane (PAL)San Clemente Station Checkpoint". This draft was prepared for the Immigration and Naturalization Service (INS) and U.S Border Patrol. This draft is a concise breakdown of the project and includes various aspects of the project including, basic information like location, the conversion of a normal lane into a PAL one, and various environmental impacts that the new project would...
Dates: Other: 1997 August